What data center decommissioning is

Decommissioning backed by 20 years of OEM engineering

Data center decommissioning is the planned shutdown and removal of the equipment in a data center, or in part of one, including servers, storage, networking, and power. It covers certified data erasure or destruction for every device that holds data, a full chain of custody from the rack to final disposition, and a decision on whether each asset is redeployed, resold, or recycled.

For 20 years we have engineered testing and repair solutions for OEMs. We bring the same tools and analytics to your data center to recover value from retired hardware and protect the data on it. Our data center decommissioning customers include Dell EMC, IBM, Google, Apple, AWS, Salesforce, and GoDaddy.

Every engagement runs with clear governance, end-to-end traceability, certified data destruction, and a program team that owns the schedule, from a few racks to a full data hall.

Track record

  1. 1.4M+

    Drives tested and analyzed

  2. 97%+

    Repaired HDD and SSD yield

  3. 100K+

    Servers, memory, and CPUs processed

  4. $75M+

    Value from one OEM's returned drives

Our process

The data center decommissioning process

  1. Assess and plan

    We start with a full assessment of your environment: the equipment, the volume of assets, the data on them, and the regulations that apply. We identify the data you need to keep before anything moves, then build a decommissioning plan around your schedule to keep disruption to a minimum.

  2. Decommission securely

    Our technicians remove servers, networking devices, storage systems, and power units following strict protocols. Every asset is tagged and logged in our secure portal, so you can see its status in real time, and equipment travels to our facilities with GPS tracking and tamper-evident seals.

  3. Sanitize and destroy

    Every data-bearing device is erased with Proteus to DoD 5220.22-M, NIST SP 800-88, HIPAA, GLBA, and PCI DSS. Where your policy calls for it, we degauss or shred instead. Every device gets a certificate of destruction tied to its serial number.

  4. Recover and recycle

    Viable equipment is tested, repaired, upgraded where it pays, and either redeployed in your environment or remarketed through our global channels. What cannot be reused is recycled by certified partners, with valuable materials recovered for manufacturing.

  5. Report

    You receive asset tracking records, destruction certificates, value recovery results, and environmental impact data, ready for finance, legal, audit, and ESG reporting.

On site

We bring our factory to you

Deploy our test equipment on site, bring in our engineers, or blend our team with yours. Our on-site team inventories and reviews assets, runs a first estimated market value analysis, sorts physically where needed, and runs diagnostics on network equipment and servers.

Redeploy or disposition strategically for better ROI and sustainability.

Proprietary diagnostics and billions of data points inform the right decision for every asset.

Explore testing

Serialized tracking, digital test results, destruction certificates, reuse and recycling documentation, and environmental reporting.

Resale, repurposing, and component harvesting, backed by a worldwide resale and recommerce platform.

Second life

Where each asset goes next

Screened and sorted assets are routed by Clarity, which weighs product grade, customer requirements, technical qualification, ESG data, and estimated market value.

Value recovery

Recovering value from erased drives

Most organizations shred drives because shredding is easy to prove. Verified erasure can be proved too, with a serialized log for every unit, and the drive keeps its resale value. Our whitepaper The Circularity Delta of Data Centers puts that value at $25 to $55 per HDD or SSD. Our false-wipe rate is below 0.01%, and the reuse avoids about 14,100 tonnes of CO₂e a year.

Servers, memory, and GPUs are worth more again, and AI hardware is being replaced faster than ever. In one recent project we decommissioned 2,500 NVIDIA GPU servers and more than 17,000 loose drives across four facilities for a global technology company, with reuse as the first option. Our guides explain the server recycling process and data center equipment recycling in more detail.

Whitepaper

The Circularity Delta of Data Centers

What shredding costs per drive, and how erasure with a serialized log for every unit recovers $25 to $55 per HDD or SSD at fleet scale.

Read the whitepaper

Clarity

Program analytics in one platform

Clarity tracks every asset and process step across your program and answers questions about it in plain language.

Real-time visibility

Throughput and yield across the program, time per process step, and the bottlenecks worth fixing.

Inventory management

Daily usage tracking, forecasting, the value of stored inventory, and proactive replenishment.

Data-driven insight

Early warning of issues before they cause delays.

AI-enabled answers

Ask questions in plain language and get instant answers, with your key KPIs shown first.

The stack

Engineering, visibility, and test layers

Our modular stack combines a hardware test layer, a lifecycle visibility hub, and an engineering and insights layer, with machine learning feeding results back into every decision.

  1. Rackwipe

    Rack test and erasure

  2. Proteus

    HDD and SSD test and erasure

  3. Phoenix

    Memory testing

  4. Maya

    NAND testing

  5. PSUT

    Power supply testing

  6. Digitized chain of custody and real-time tracking

  7. Smart disposition and analytics

  8. Environmental impact reporting

Choosing a partner

What to look for in a data center decommissioning company

A decommissioning company should certify every erasure against a serial number, keep one chain of custody from removal to the final report, and test equipment for reuse and resale before anything is shredded. Our facilities are audited against these certifications:

Our facilities also hold ISO 9001, ISO 14001, ISO 45001, CTPAT, and WEEELABEX certifications. Our engineers and test equipment can work in your data center, at our sites, or alongside your own team.

Checklist

Your data center decommissioning checklist

Case studies

Data center decommissioning case studies

$75M+ from data center drives

A leading OEM of storage devices turned to Reconext to maximize the value of returned storage devices while safeguarding sensitive data and proprietary technology.

  1. Remarketed drives generating over $75M in revenue

  2. Hundreds of thousands of drives processed and repurposed for reuse

  3. A white-label process that protects the brand integrity of the client's original devices

  4. Rare earth metals extracted and reused in the production of new drives, for further circular economy benefits

Data center decommissioning questions

What is data center decommissioning?

The secure dismantling and removal of data center equipment at end of life, including certified data wiping, physical destruction where needed, and responsible recycling, so data is erased and equipment is reused or disposed of compliantly.

How do you keep data secure?

Proteus performs certified wiping and destruction to DoD 5220.22-M, HIPAA, GLBA, PCI DSS, and NIST SP 800-88, and every device gets a certificate of destruction.

What happens to decommissioned equipment?

Each asset is evaluated. Viable equipment is refurbished and remarketed; the rest is recycled responsibly, which cuts e-waste and increases reuse. Our data center ITAD guide walks through each decision.

Why does decommissioning matter?

It protects sensitive data, keeps you compliant with data protection and environmental rules, and recovers value from assets through resale or sustainable recycling.

How long does it take?

It depends on the size and complexity of the site and the volume of equipment. We build a custom timeline from a detailed assessment to keep downtime low.

What equipment do you handle?

Servers, networking devices, storage systems, power units, cables, and connections.

How do you decommission a data center?

In five steps: assess and plan, remove the equipment securely, sanitize or destroy every data-bearing device, recover value through redeployment, resale, or recycling, and report on every asset. Our decommissioning process guide and five key phases cover each step in detail.

What is a data center decommissioning plan?

A document that sets out the assets involved, the data to keep, the sanitization method for each device, the logistics and chain of custody, the schedule, and the reporting at the end. We build it with you after the assessment. Start with our data center decommissioning checklist and our guide to planning a safe shutdown.

Which data destruction methods do you use?

Software erasure of hard drives and SSDs with Proteus, in-rack erasure and testing with Rackwipe, degaussing when data cannot leave your building, and shredding or crushing when your policy requires it.

What happens to GPUs and AI servers?

We test and validate them, often in the rack with Rackwipe, then redeploy or remarket them. GPUs hold their resale value, so we test them for reuse before anything else. How we recover GPU value.

Do you provide certificates of destruction?

Yes, for every device, tied to its serial number, along with chain-of-custody logs, recycling certificates, and value recovery reports. See our guide to hard drive destruction compliance.

Do you buy retired data center equipment?

Yes. We can remarket it for you through a revenue-share agreement or buy it from you directly, and settlement reports show what each asset returned.

Contact

Start solving your toughest lifecycle challenges

Tell us about your decommissioning project and a data center specialist will reply within one business day.

Running a tender? Download our ITAD RFP template.

“Operationally, a great day is boring. It means we have had no issues, all with 100% quality. Reconext makes things boring for us on most occasions.”

Brett Pagenkopp, SVP Operational Services, Verifone
This field is for validation purposes and should be left unchanged.
First Name(Required)
Last Name(Required)